Nucleus – Lightshow
Team: Marisa Jäger (Project author), Stephan Urech
10.-13.09.2015, Zeit Räume Basel, Biennale für neue Musik und Architektur
Katalog Zeit Räume Basel, 2015 (PDF)
The Rheindüker is a 362-meter utility tunnel running 20 meters beneath the Rhine in Basel, connecting the Novartis campus in Grossbasel to the Dreirosenanlage park on the Kleinbasel side. It carries the city’s electricity, water, and gas infrastructure under the riverbed.
Tech stack: Mac OSX, Quartz Composer, Vezér, Enttec ODE DMX Interface, 60 DMX Spots, Audio Interface, Subwoofer, 600m DMX cables, 600m Powercon cables, Green plastic filter sheets, Headlamps, Skateboard, Table on wheels


